On 20 November 2026, Xinhua Index recorded a Dingxi whole-potato powder ex-works price of CNY 10,087 per tonne, up 0.87% from 13 November and down 1.75% year on year. Dingxi potato starch was broadly flat week on week at CNY 6,051.30 per tonne and down 9.62% year on year. Use these market observations to illustrate the calculation. For a purchase, use the quoted grade and delivered cost. Xinhua Index weekly monitoring
Put supplier quotes on a delivered basis
Record grade, pack size, order quantity, destination, tax basis and validity. Allocate any separately payable freight or packaging to the usable weight received. Count each charge once. Use the same tax basis for every quote.
Cost what you can release as finished product
Ingredient cost per 100 kg accepted output = total batch ingredient cost ÷ accepted batch weight × 100.
Keep separate fields for input weight and accepted output. Water uptake, equipment residues, forming rejects and rework can change the amount of saleable product.
Assume both formulations yield 100 kg of accepted product. Using the monitored prices, 30 kg of whole-potato powder costs CNY 302.61. Using 20 kg of whole-potato powder and 10 kg of starch costs CNY 262.25. The illustrative difference is CNY 40.36, or 13.3% of the first formulation’s subtotal for these ingredients. Add other inputs, labor, packaging and loss for the complete cost. Check accepted yield before assuming a saving carries through to the finished product.
Compare formats on the target production line
| Format | Check in the trial | Add to the costing sheet |
|---|---|---|
| Flakes | Hydrated texture, forming and flavor | Approved dosage and rework |
| Granules | Flow, dosing and dry-blend uniformity | Actual dosing deviation |
| Pregelatinized powder | Qualify cold dispersion, hydration or thickening by grade | Addition sequence, water and mixing time |
If screening a partial replacement with native starch, hold the baseline formulation and heating conditions constant. Record three checks: hydration and forming, finished flavor, and implications for labeling. Adjust water and process in a second round for candidates that merit further work. Keep the two trial records separate so the team can identify which changes affected yield.
Ask procurement for the delivered price, R&D for the approved formula and production for actual usage and accepted output.
For a costing review, send the application, current formulation, required receipt date and monthly volume. Use the dispatch plan for holiday orders. Contact form · Spring Festival dispatch plan